Cobham plc :: The most important thing we build is trust
Cobham plc
 
 

Refine your search

Site

By Perspective

Content Type

Summary Information

 

Cobham Search

 


48 results containing "system safety engineering and assurance" were found

Page 1 of 3  1 2 3 >



  • Cobham plc :: Products and Services

    E F G H I J K L M N O P Q R S T U V W X Y Z Actuation Systems ADAHRS (Air Data Attitude Heading Reference System) Advanced Technology Apertures Aerospace Concept, design and certification Aerospace Lighting Aerospace Man / Machine Interfaces Air to Air Refuelling Equipment @ Davenport (USA) | Wimborne (UK) . Air Traffic Management Airborne Antenna Solutions @ Dourdan (France) | Marlow...

    Document is written in and is 85582 bytes long
  • Cobham plc :: Defence Systems, Sensor Systems, Largo, SPS500

    SPS-500 SPS-500 Precision Positioners Cost-Effective, High-Performance Positioning Systems All positioners manufactured by Cobham are based upon a scaleable design that is the result of more than 20 years of experience in positioner...

    Document is written in and is 37893 bytes long
  • Cobham plc :: Defence Systems, Sensor Systems, Largo, SPS4000

    SPS-4000 SPS-4000 Precision Positioners Cost-Effective, High-Performance Positioning Systems All positioners manufactured by Cobham Sensor Systems Largo (CSS) are based upon a scaleable design that is the result of more than 20 years of...

    Document is written in and is 37499 bytes long
  • Annual Report and Accounts 2009

    Cobham plc Annual Report and Accounts 2009 The most important thing we build is trust C obh am plc A nnual Repo rt and A cco unts 2009 w w w .cobham .co m www.cobham.comCobham plc Brook Road, Wimborne, Dorset,...

    Document is written in and is 5233549 bytes long
  • Microsoft Word - 132514_C Terms and Conditions.docx

    Standard Conditions of Purchase US Law Master v1 Mar 10 DOC.132514 REV C Page 1 of 9 TERMS AND CONDITIONS FOR THE PURCHASE OF GOODS AND SERVICES This Agreement is by and between the company issuing the Purchase Order...

    Document is written in and is 182118 bytes long
  • Cobham_technical_services_231009.indd

    ANTENNA AND ELECTRONIC SYSTEMS Leading-edge technology for satellite communications, avionics, radar and surveillance applications. ENGINEERING CONSULTANCY SERVICES World-class electrical, mechanical, materials, EMC, safety, failure...

    Document is written in and is 660337 bytes long
  • Microsoft Word - QualityManual_22.doc

    email us at era.qa@cobham.com. © Copyright Cobham Technical Services 2010. All rights reserved. Introduction In March 2009 ERA Technology Ltd adopted the trading name "Cobham Technical Services". This manual describes Cobham Technical Services' Quality Management System and is specifically provided for use by the Company's employees. However, it is freely available to all our Customers, Partners, Suppliers and Subcontractors to give them an understanding of Cobham Technical Services and the way it operates. The objective of this manual is to provide a user-friendly entry to the Cobham Technical...

    Document is written in and is 272228 bytes long
  • Untitled Document

    The most important thing we build is trust Corporate Responsibility & Sustainability 2009 Cobham’s products and services have been at the heart of sophisticated military and civil systems for 75 years, keeping people safe, improving...

    Document is written in and is 3711014 bytes long
  • Microsoft Word - Quality Clauses PTD.docx

    Clauses are applicable only as noted on Purchase Order) Carleton Technologies Inc 711 Corporate Center Court, Suite A Westminster, MD 21157 410-871-9966 Page 1 800 QUALITY PROGRAM REQUIREMENTS - MIL-Q-9858A The supplier shall provide and maintain a system that complies with MIL-Q-9858A. “Quality Program Requirements”. Compliance with this clause in no way relieves the seller of the responsibility to furnish acceptable supplies or services as specified on the purchase document. (A Quality Program IAW ISO-9001 may be utilized in lieu of this requirement). 801 INSPECTION SYSTEM...

    Document is written in and is 87811 bytes long
  • Untitled Document

    18 Cobham plc | 2010 Corporate responsibility and sustainability report Pursuing zero harm Providing safer, healthier and environmentally friendlier operations, activities, products and services that will serve to attract and retain...

    Document is written in and is 1133769 bytes long
  • Untitled Document

    AVIONICS AND SURVEILLANCE End to end avionics and covert surveillance solutions DEFENCE SYSTEMS Critical technology for network centric operations MISSION SYSTEMS Complete ‘nose to tail’ refuelling and ‘wingtip to wingtip’ mission systems...

    Document is written in and is 1729436 bytes long
  • Microsoft Word - QC Form 2 Rev W.docx

    2011 (Clauses are applicable only as noted on Purchase Order) Carleton Technologies Inc 10 Cobham Drive Orchard Park, NY 14127 716-662-0006 Page 1 800 QUALITY PROGRAM REQUIREMENTS - MIL-Q-9858A The supplier shall provide and maintain a system that complies with MIL-Q-9858A “Quality Program Requirements”. Compliance with this clause in no way relieves the seller of the responsibility to furnish acceptable supplies or services as specified on the purchase document. (A Quality Program IAW ISO-9001 may be utilized in lieu of this requirement). 801 INSPECTION SYSTEM...

    Document is written in and is 62222 bytes long
  • Microsoft Word - CR2004MV-MASTERDONOTEDELETE.doc

    Cobham plc Corporate Responsibility Report 2004 2 Cobham plc: Corporate Responsibility Report 2004 This report covers 99% by turnover of Cobham’s 100% owned subsidiaries 2004 Revenue by Operating Group F light Ops £188m A SG £386m C helto...

    Document is written in and is 1781093 bytes long
  • Untitled Document

    UNCLASSIFIED Ref: FRL/QAM/10 Subject: Supplier Quality Requirements Issue: 4. Title: Supplier Management Page: 2 of 21 Flight Refuelling Ltd trading as Cobham Mission Equipment has proprietary rights in the information disclosed...

    Document is written in and is 535239 bytes long
  • Untitled Document

    Corporate Responsibility and Sustainability 2008 The most important thing we build is trust Allan E Cook CBE Chief Executive Message from the Chief Executive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 ...

    Document is written in and is 2822354 bytes long
  • Microsoft Word - UG6-044LPA Rev A - Product Acceptance - Lansdale Focus Factories _Released 6.21.11_ DRA46346.docx

    USER GUIDE TITLE: Product Acceptance – Lansdale Focus Factories UG6-044LPA EFFECTIVE DATE: June 21, 2011 Revision Level: A RESPONSIBLE DIRECTORATE(S): Mission Success and Product Assurance is responsible...

    Document is written in and is 3342697 bytes long
  • Microsoft Word - QPUR05-1 v10 Vendor Quality RequirementsTR.doc

    Quality System Procedure Vendor Quality Requirements QPUR05-1, Rev 9 Page 1 of 5 Vendor Quality Requirements Procedure No.: QPUR05-1 Revision: 10 Date Revised: 31 Mar 11 Approvals Change History Revision Description of Change Date W2 Added Workmanship Manual reference, Added VQR34, VQR35, VQR36 W4 Changed Logo W5 Updated 1.0 to define scope, added engineering responsibility, corrected table references and footers, Changed inspection to verification. 2 Updated to include...

    Document is written in and is 238993 bytes long
  • Untitled Document

    Cobham plc Annual Report & Accounts 2003 Cobham’s principal activities are: • the design, manufacture, sale and support of fluid and air distribution components and systems, countermeasures, air refuelling equipment, aviation auxiliary...

    Document is written in and is 1318438 bytes long
  • PowerPoint Presentation

    Preliminary Results 20071 Preliminary Results 2007 v3 Preliminary Results 6 March 2008 Preliminary Results 20072 Summary Profit and Loss Account Year to 31/12/06 £m Unaudited Year to 31/12/07 £m Growth Revenue 1,015.7 1,061.1 4.5% Trading...

    Document is written in and is 2693464 bytes long
  • Untitled Document

    The most important thing we build is trust Cobham plc Annual Report and Accounts 2008 Cobham plc Annual Report and Accounts 200 8 www.cobham.co mwww.cobham.comCobham plc Brook Road, Wimborne, Dorset, BH21 2BJ England T: +44...

    Document is written in and is 3903086 bytes long
Page 1 of 3  1 2 3 >